ColoGPU is not connected to Vast.ai or RunPod. We cannot get you approved by either. Requirements change, so always confirm them on the marketplace's own pages before you sign anything with a data centre.

What does Vast.ai require for datacenter status?

As documented by Vast on its datacenter status page (checked 17 November 2026), the requirements include:

Vast decides who gets the status, and its requirements can change. Read Vast's page for the current list before you plan a move.

RunPod: RunPod has its own requirements for hosting partners; check RunPod's current terms at runpod.io.

Small hosts are welcome

You do not need a full rack or a big power bill to ask us. If you have a few servers, need under 25 kW, or only want part of a rack, tell us — the Get Matched form has options for each of these. Not every facility takes part racks or small power loads, so we will tell you plainly what we find.

One thing to know: on Vast’s own page, datacenter status needs at least 5 servers (or equivalent equipment). With fewer servers you can still move into a data centre for better power, cooling and connectivity, but you would not meet that particular Vast requirement yet.

Why a home rack does not qualify

Going by the requirements Vast documents, a home or office setup falls short on the facility itself: there is no third-party certified data centre, and so no data-centre contract or invoice to show as evidence. However good the hardware and connection, the paperwork Vast asks for comes from the facility, not from the host.

What to ask a data centre before you move your GPU servers

How ColoGPU helps

Tell us how many servers you have (one or a few is fine), the power they draw, where you would like them to be and when. We look for facilities that may fit and introduce you, so you can ask them the questions above directly. Whether a facility's certificates and paperwork satisfy a marketplace is for the marketplace to decide.

Free for hardware owners. Data centres may pay us an introduction fee once agreements are in place; none are in place yet. See how we make money.

Moving GPU servers into a data centre?

A few servers, under 25 kW or part of a rack is fine. Tell us your server count, power, preferred location and timing, and we’ll be in touch as soon as we can.

Get Matched

or use the contact form